AODSS                                                Distillation – System Startup and Shutdown

Trainee Name____________________________

Trainee Social Security Number: ____________

Trainee Status:  _______

Course Name: ___________________

Course Code: ___________________   

National Center Course Number: ___________

Date Course Completed: ____________________

Performance Criteria Completed:  _____________



Performance Objectives:
  Pass Fail
Topic 1: Startup
     
1.1 Briefly describe the distillation process as it is performed at your site. ____   ____
     
1.2 State the purpose of pre-startup checks. ____   ____
     
1.3 List pre-startup checks that are made on a distillation system at your site. ____   ____
     
1.4 Describe what takes place during a distillation system startup procedure at your site. ____   ____
     
     
Topic 2: Shutdown    
     
2.1 Describe a short-term shutdown procedure that is performed at your site. ____   ____
     
2.2 Describe an emergency shutdown procedure that is performed at your site. ____   ____
     
2.3 Describe a long-term shutdown procedure that is performed at your site. ____   ____


Performance Evaluator’s Signature:____________________________

Performance Evaluator’s Name (Print):____________________________

Date Completed:____________________________