AOCFS                                                Power Plant – Condensate and Feedwater Systems

Trainee Name____________________________

Trainee Social Security Number: ____________

Trainee Status:  _______

Course Name: ___________________

Course Code: ___________________   

National Center Course Number: ___________

Date Course Completed: ____________________

Performance Criteria Completed:  _____________



Performance Objectives:
  Pass Fail
Topic 1: System Overview
     
1.1 Describe the basic layout of a condensate and feedwater system at your site. ____   ____
     
1.2 Describe the basic function and operation of the individual components in a condensate and feedwater system at your site. ____   ____
     
     
Topic 2: System Operation    
     
2.1 Describe the normal operation of a conden- sate and feedwater system at your site and identify operator responsibilities that are associated with normal operation. ____   ____
     
2.2 Identify and describe some common oper- ating problems that may occur in a conden- sate and feedwater system and describe basic steps for dealing with these problems. ____   ____


Performance Evaluator’s Signature:____________________________

Performance Evaluator’s Name (Print):____________________________

Date Completed:____________________________