AOBSS                                                Boilers – Startup and Shutdown

Trainee Name____________________________

Trainee Social Security Number: ____________

Trainee Status:  _______

Course Name: ___________________

Course Code: ___________________   

National Center Course Number: ___________

Date Course Completed: ____________________

Performance Criteria Completed:  _____________



Performance Objectives:
  Pass Fail
Topic 1: Basic Procedures
     
1.1 Perform a pre-startup inspection of a drum-type boiler. ____   ____
     
1.2 Perform a cold startup of a drum-type boiler. ____   ____
     
1.3 Properly shut down a drum-type boiler. ____   ____
     
     
Topic 2: Once-Through Boilers    
     
2.1 Compare the operation of a once- through boiler with the operation of a drum-type boiler. ____   ____
     
2.2 Describe how a steam/water separation system is used during the startup and shutdown of a once-through super- critical boiler. ____   ____


Performance Evaluator’s Signature:____________________________

Performance Evaluator’s Name (Print):____________________________

Date Completed:____________________________